Carregant...
Carregant...

Vés al contingut (premeu Retorn)

Erratum to “A solution procedure for type E simple assembly line balancing problem"

Autor
García-Villoria, A.; Pastor, Rafael
Tipus d'activitat
Article en revista
Revista
Computers and industrial engineering
Data de publicació
2013-10-01
Volum
66
Número
1
Pàgina inicial
201
Pàgina final
202
DOI
https://doi.org/10.1016/j.cie.2013.05.015 Obrir en finestra nova
Repositori
http://hdl.handle.net/2117/20598 Obrir en finestra nova
Resum
The objective of SALBP-E is to minimize the product on the number of workstations by the cycle time. Recently Wei and Chao [Comput. Ind. Eng. 61 (2011) 824–830] have proposed an exact procedure for solving this problem. It is based on solving iteratively SALBP-2 by means of a MILP model. SALBP-E has not been much studied and hence the high interest of their work. However, the article has several errors that make its understanding harder and, moreover, impede the correct implementation of their...
Citació
García-Villoria, A.; Pastor, R. Erratum to “A solution procedure for type E simple assembly line balancing problem". "Computers and industrial engineering", 01 Octubre 2013, vol. 66, núm. 1, p. 201-202.
Paraules clau
Manufacturing Optimization, Simple Assembly Line Balancing Problem, Type E Simple Assembly Line Balancing Problem
Grup de recerca
SCOM - Supply Chain and Operations Management

Participants