Carregant...
Carregant...

Vés al contingut (premeu Retorn)

A New Constructive Heuristic for the Fm|block|ST

Autor
Companys , R.; Ribas, I.
Tipus d'activitat
Capítol de llibre
Llibre
Managing complexity. Challenges for industrial engineering and operations management. Lecture notes in management and industrial engineering 2014
Pàgina inicial
285
Pàgina final
291
Editorial
Springer
Data de publicació
2014-08-31
ISBN
978-3-319-04705-8 Obrir en finestra nova
Repositori
http://hdl.handle.net/2117/24832 Obrir en finestra nova
URL
http://link.springer.com/book/10.1007%2F978-3-319-04705-8 Obrir en finestra nova
Resum
This paper deals with the blocking flow shop problem and proposes new constructive procedures for the total tardiness minimization of jobs. The heuristic has three-phases to build the sequence; the first phase selects the first job to be scheduled, the second phase arranges the remaining jobs and the third phase uses the insertion procedure of NEH to improve the sequence. The proposed procedures evaluate the tardiness associated to the sequence obtained before and after the third phase in order ...
Citació
Companys , R.; Ribas, I. A New Constructive Heuristic for the Fm|block|ST. A: "Managing complexity: challenges for industrial and operations management". 2014, p. 285-291.
Paraules clau
Flow Shop, Blocking, Tardiness
Grup de recerca
EOLI - Enginyeria d'Organització i Logística Industrial

Participants