Carregant...
Carregant...

Vés al contingut (premeu Retorn)

Incorporating working conditions to a mixed- model sequencing problem

Autor
Bautista, J.; Alfaro, R.; Llovera, S.; Batalla, C.
Tipus d'activitat
Document cientificotècnic
Data
2014-11-13
Codi
OPE-WP.2014/10
Projecte finançador
Convenio Cátedra Nissan Motor Ibérica de Innovación en la Automoción
PROTHIUS-III: Programación Restringida de Operaciones en Talleres Híbridos Integrados sobre Unidades en Secuencia. Industria del automóvil (aspectos económicos, jurídicos y sociales)
Repositori
http://hdl.handle.net/2117/24726 Obrir en finestra nova
Resum
Beginning with a variation of the sequencing problem in a mixed-products line (MMSP-W: Mixed-Model Sequencing Problem with Workload Minimization), we propose two new models that incorporate the working conditions into the workstations on the line. The first model takes into account the saturation limit of the workstations, and the second model also includes the activation of the operators throughout the working day. Two computational experiments were carried out using a case study of the Nissan ...
Citació
Bautista, J. [et al.]. "Incorporating working conditions to a mixed- model sequencing problem". 2014.
Paraules clau
Sequencing Operations, Mixed-products Lines, Work Overload, Saturation, Activity Factor, Mmsp-w
Grup de recerca
OPE-PROTHIUS - Organització de la Producció en Tallers Híbrids

Participants

Arxius