Carregant...
Carregant...

Vés al contingut (premeu Retorn)

Handover defects: comparison of construction and post-handover housing defects

Autor
Forcada, N.; Macarulla, M.; Gangolells, M.; Casals, M.
Tipus d'activitat
Article en revista
Revista
Building research and information
Data de publicació
2016-03
Volum
44
Número
3
Pàgina inicial
279
Pàgina final
288
DOI
https://doi.org/10.1080/09613218.2015.1039284 Obrir en finestra nova
Repositori
http://hdl.handle.net/2117/78911 Obrir en finestra nova
URL
http://www.tandfonline.com/doi/abs/10.1080/09613218.2015.1039284 Obrir en finestra nova
Resum
Although inspections occur during construction or at handover, customers do not normally participate. This situation creates a gap between the quality perceived by both contractors and customers. An analysis of 52 552 handover defects in 2179 flats in Spain is presented which identified their nature, the building element and trade where these defects are located. These results are compared with previous studies that analysed defects detected during the construction stage and those that remain af...
Citació
Forcada, N., Macarulla, M., Gangolells, M., Casals, M. Handover defects: comparison of construction and post-handover housing defects. "Building research and information", Març 2016, vol. 44, núm. 3, p. 279-288.
Paraules clau
Construction defects, Customer complaints, Defects, Housing, Quality control, Spain
Grup de recerca
GRIC - Grup de Recerca i Innovació de la Construcció

Arxius