Carregant...
Carregant...

Vés al contingut (premeu Retorn)

Grimsel Test Site - Long-Term Cement Studies. Reactive Transport Modeling of Experiment 2 at Grimsel

Autor
Saaltink, M.; Soler, J.
Tipus d'activitat
Document cientificotècnic
Data
2016-04
Codi
Working report 2016-14
Repositori
http://hdl.handle.net/2117/87772 Obrir en finestra nova
URL
http://www.posiva.fi/en/databank/grimsel_test_site_long-term_cement_studies._reactive_transport_modeling_of_experiment_2_at_grimsel..1867.xhtmlhttp://www.posiva.fi/files/4133/WR_2016-14.pdf Obrir en finestra nova
Resum
Within the framework of the GTS-LCS project (Grimsel Test Site – Long-Term Cement Studies), an in-situ experiment lasting about 5 years was started in 2009 to study water-cement-rock interactions in fractured granite. A solid cement source (OPC) was installed in a borehole intersecting a water conducting fracture. Two other boreholes at about 0.56 m (observation) and 1.12 m (extraction) from the emplacement borehole were used to monitor the evolution of water composition in the fracture. Prior...
Citació
Saaltink, M., Soler, J. "Grimsel test site - Long-term cement studies.Reactive transport modeling of experiment 2 at Grimsel". 2016.
Paraules clau
Grimsel, fracture, granite, portlandite, reactive transport modeling
Grup de recerca
GHS - Grup d'Hidrologia Subterrània

Participants

Arxius