Carregant...
Carregant...

Vés al contingut (premeu Retorn)

Factors affecting rework costs in construction

Autor
Forcada, N.; Gangolells, M.; Casals, M.; Macarulla, M.
Tipus d'activitat
Article en revista
Revista
Journal of construction engineering and management (ASCE)
Data de publicació
2017-08
Volum
143
Número
8
Pàgina inicial
04017032/1
Pàgina final
04017032/9
DOI
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001324 Obrir en finestra nova
Repositori
http://hdl.handle.net/2117/102983 Obrir en finestra nova
URL
http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001324 Obrir en finestra nova
Resum
Rework adversely impacts the performance of building projects. In this study, data were analyzed from 788 construction incidents in 40 Spanish building projects to determine the influence of project and managerial characteristics on rework costs. Finally, regression analysis was used to understand the relationship between the contributing factors, and to determine a model for rework prediction.Interestingly, the rework prediction model showed that only the original contract value (OCV) and the p...
Citació
Forcada, N., Gangolells, M., Casals, M., Macarulla, M. Factors affecting rework costs in construction. "Journal of construction engineering and management (ASCE)", Agost 2017, vol. 143, núm. 8, p. 04017032/1-04017032/9
Paraules clau
Construction, Project characteristics, Regression model, Rework costs
Grup de recerca
GRIC - Grup de Recerca i Innovació de la Construcció