Carregant...
Carregant...

Vés al contingut (premeu Retorn)

Time-based conditions for synchronized procurement in Douki Seisan

Autor
Bautista, J.; Fortuny-Santos, J.
Tipus d'activitat
Capítol de llibre
Llibre
Closing the gap between practice and research in industrial engineering. Lecture Notes in Management and Industrial Engineering
Pàgina inicial
231
Pàgina final
238
Editorial
Springer
Data de publicació
2017-08-18
ISBN
978-3-319-58409-6
DOI
https://doi.org/10.1007/978-3-319-58409-6 Obrir en finestra nova
Repositori
https://rd.springer.com/book/10.1007%2F978-3-319-58409-6 Obrir en finestra nova
URL
https://www.springer.com/978-3-319-58408-9?wt_mc=ThirdParty.RD.3.EPR653.About_eBook Obrir en finestra nova
Resum
This book presents the proceedings of the XXII International Conference on Industrial Engineering and Operations Management, International IIE Conference 2016, and International AIM Conference 2016. This joint conference is a result of an agreement between ADINGOR (Asociación para el Desarrollo de la Ingeniería de Organización), ABEPRO (Associação Brasileira de Engenharia de Produção), AIM (European Academy for Industrial Management) and the IIE (Institute of Industrial Engineers), and to...
Paraules clau
Lean Manufacturing, Mixed-model Assembly Line, Just-in-sequence
Grup de recerca
OPE - Organització de la Producció i d'Empresa (aspectes tècnics, jurídics i econòmics en Producció)

Participants