  • Modeling and Solving a Variant of MMSP-W Problem with Production Mix Restrictions

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    Date of publication: 2014-01-01
    Book chapter

    Read the abstract Read the abstract View View Open in new window  Share Reference managers Reference managers Open in new window

    In this paper, we propose a procedure based on Bounded Dynamic Programming (BDP) to solve the Mixed-Model Sequencing Problem with Work overload Minimisation (MMSP-W), with serial workstations, unrestricted (or free) interruption of the operations and with production mix restrictions.

  • Modelos para la localización y cubrimiento del servicio de desfibrilación semiautomática en espacios públicos de Barcelona

     Bautista Valhondo, Joaquin; Soriano Llobera, Juan Manuel; Alfaro Pozo, Rocio; Batalla Garcia, Cristina; Llovera Laborda, Sara
    International Conference on Occupational Risk Prevention
    Presentation's date: 2014-05-22
    Presentation of work at congresses

    Read the abstract Read the abstract  Share Reference managers Reference managers Open in new window

    Según la OMS, las enfermedades cardiovasculares son la causa principal de mortalidad en Europa (4 millones al año). Ante un paro cardiaco con testigos, la desfibrilación precoz, aplicada antes de transcurrir 10 minutos, puede salvar entre un 15 y un 90% de vidas según la tardanza en efectuar la desfibrilación. Por ello, la Associació Barcelona Salut propone el proyecto ¿Barcelona, ciutat cardioprotegida¿, cuyo objetivo es dotar a la ciudad de un sistema de protección ante la muerte súbita, instalando desfibriladores semiautomáticos en espacios públicos. En este marco, este trabajo se centra en la formulación de modelos de programación lineal entera mixta (MILP), para problemas de localización y cubrimiento del servicio con los objetivos: (1) minimizar el coste de instalación para alcanzar la cobertura total de un territorio urbano, y (2) maximizar la cobertura del territorio cuando se fija un presupuesto al coste de instalación.

  • Impact due to the saturation concept in assembly lines on the work overload

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Cano Perez, Alberto; Batalla Garcia, Cristina
    International Conference on Occupational Risk Prevention
    Presentation's date: 2014-05-21
    Presentation of work at congresses

    Read the abstract Read the abstract  Share Reference managers Reference managers Open in new window

    En una línea de montaje de productos mixtos, el tiempo requerido por una unidad de un producto en una estación no coincide con el tiempo disponible en ella (ciclo). Este trabajo se centra en el MMSP-W (Mixed Model Scheduling Problem-Work overload), un problema de secuenciación de productos en dichas líneas, y comprende: (1) las definiciones saturación estática (propia del equilibrado de la línea) y saturación dinámica (propia de la secuencia de fabricación), (2) la extensión del MMSP-W, al que se incorpora la saturación dinámica, (3) la explotación del nuevo modelo en una línea de motores, y (4) un análisis del impacto generado por la variación de la saturación dinámica máxima permitida, sobre los RRHH adicionales mínimos necesarios para eliminar la sobrecarga de trabajo (W), para una demanda y un mix de producción dados.

  • Unifying metrics of risk assessment methods for application to mixed models assembly line balancing problems

     Bautista Valhondo, Joaquin; Batalla Garcia, Cristina; Alfaro Pozo, Rocio; Sanchez Ferradal, Paula
    International Conference on Occupational Risk Prevention
    Presentation's date: 2014-05-21
    Presentation of work at congresses

    Read the abstract Read the abstract  Share Reference managers Reference managers Open in new window

    A partir de tres métodos de la Ergonomía, se establece un sistema unificado de métricas para los niveles de riesgo de operaciones en líneas de producción del sector de automoción. Se define el concepto riesgo ergonómico como una función lineal dependiente de los tiempos de proceso de las operaciones y del factor de actividad aplicado por los operarios. Además, se formula un modelo matemático que incorpora como objetivo la minimización del riesgo ergonómico en problemas de equilibrado de líneas, y se explota dicho modelo a través de un caso de estudio basado en una línea de montaje de 9 tipos de motor con 140 operaciones. Tras ello, para una demanda y un mix de producción dados, se analiza el impacto generado por la variación del riesgo ergonómico máximo permitido, en cada estación de trabajo, sobre las necesidades de RRHH. Se concluye con una discusión sobre la naturaleza multiobjetivo del problema en la que se contraponen los beneficios económicos frente a los sociales.

  • Access to the full text
    Acoso Laboral: Un análisis normativo y jurisprudencial  Open access

     Llovera Laborda, Sara; Alfaro Pozo, Rocio; Bautista Valhondo, Joaquin
    Date: 2014-07-14
    Report

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    Resumen: El acoso moral o ¿mobbing¿ es un problema grave que constituye una lacra en el ámbito laboral con repercusiones directas en la esfera no sólo profesional sino también personal del trabajador afectado y requiere de un profundo análisis para determinar las formas de prevenirlo, combatirlo y tratarlo. El legislador hace escasamente 4 años tipificó como delito el acoso laboral, tomando conciencia que ante supuestos graves de acoso moral debía otorgarse una protección reforzada a través de la jurisdicción penal. En el presente trabajo vamos a analizar la regulación normativa y tratamiento jurisprudencial del acoso moral concluyendo con un análisis sobre las posibles lagunas existentes y la necesidad de que todos los sectores afectados, empresa y trabajador, contribuyan en la lucha contra este tipo de conductas. Abstract: Mobbing is a serious issue that constitutes a blight in the workplace with direct consequences not only in the professional field but also personal of the worker affected. Mobbing requires a thorough analysis to determine ways to prevent it, combat it, and treat it. The legislator barely four years ago classified the mobbing as a crime, being aware that in serious cases of mobbing should be given greater protection through the criminal courts. In this paper we analyze the legal normative and jurisprudence of the mobbing. We end with an analysis of the possible legal loopholes and the need for all sectors affected, the company and the workers contribute to the fight against this type of behavior.

    Resumen: El acoso moral o “mobbing” es un problema grave que constituye una lacra en el ámbito laboral con repercusiones directas en la esfera no sólo profesional sino también personal del trabajador afectado y requiere de un profundo análisis para determinar las formas de prevenirlo, combatirlo y tratarlo. El legislador hace escasamente 4 años tipificó como delito el acoso laboral, tomando conciencia que ante supuestos graves de acoso moral debía otorgarse una protección reforzada a través de la jurisdicción penal. En el presente trabajo vamos a analizar la regulación normativa y tratamiento jurisprudencial del acoso moral concluyendo con un análisis sobre las posibles lagunas existentes y la necesidad de que todos los sectores afectados, empresa y trabajador, contribuyan en la lucha contra este tipo de conductas. Abstract: Mobbing is a serious issue that constitutes a blight in the workplace with direct consequences not only in the professional field but also personal of the worker affected. Mobbing requires a thorough analysis to determine ways to prevent it, combat it, and treat it. The legislator barely four years ago classified the mobbing as a crime, being aware that in serious cases of mobbing should be given greater protection through the criminal courts. In this paper we analyze the legal normative and jurisprudence of the mobbing. We end with an analysis of the possible legal loopholes and the need for all sectors affected, the company and the workers contribute to the fight against this type of behavior.

    Documento científico técnico que analiza desde la regulación normativa y algunos pronunciamientos jurisprudenciales el tema del acoso moral en las empresas.

  • Impact of the production mix preservation on the ORV problem

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio; Batalla Garcia, Cristina
    Date of publication: 2013-09-19
    Book chapter

    View View Open in new window  Share Reference managers Reference managers Open in new window

  • Incorporating ergonomics factors into the TSALBP

     Bautista Valhondo, Joaquin; Batalla Garcia, Cristina; Alfaro Pozo, Rocio
    Date of publication: 2013-09-02
    Book chapter

    Read the abstract Read the abstract View View Open in new window  Share Reference managers Reference managers Open in new window

    We propose a mathematical model to solve an extension to the mixed-model sequencing problem with work overload minimization (MMSP-W) for production lines with serial workstations and parallel homogeneous processors and regularizing the required workload. We performed a computational experience with a case study of the Nissan engine plant in Barcelona.

  • Incorporating regularity of required workload to the MMSP-W with serial workstations and free interruption of the operations

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Cano Perez, Alberto
    Date of publication: 2013-09-02
    Book chapter

    Read the abstract Read the abstract View View Open in new window  Share Reference managers Reference managers Open in new window

    We propose a mathematical model to solve an extension to the mixed-model sequencing problem with work overload minimization (MMSP-W) for production lines with serial workstations and parallel homogeneous processors and regularizing the required workload. We performed a computational experience with a case study of the Nissan engine plant in Barcelona.

  • Impact of the production mix preservation on the ORV problem

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio; Batalla Garcia, Cristina
    Conferencia de la Asociación Española para la Inteligencia Artificial
    Presentation's date: 2013-09-19
    Presentation of work at congresses

    View View Open in new window  Share Reference managers Reference managers Open in new window

  • Incorporating the work pace concept into the MMSP-W

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Batalla Garcia, Cristina; Cano Perez, Alberto
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2013-07-11
    Presentation of work at congresses

    View View Open in new window  Share Reference managers Reference managers Open in new window

  • Access to the full text
    Solving the mixed model sequencing problem with workload minimization with product mix preservation  Open access

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio; Batalla Garcia, Cristina
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2013-07-11
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    This work is supported by the Spanish Ministerio de Educación y Ciencia under Project DPI2010-16759 (PROTHIUS-III) including EDRF fundings.

  • Impact of ergonomic risk reduction in the TSALBP-1

     Bautista Valhondo, Joaquin; Batalla Garcia, Cristina; Alfaro Pozo, Rocio; Cano Perez, Alberto
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2013-07-11
    Presentation of work at congresses

    View View Open in new window  Share Reference managers Reference managers Open in new window

  • Access to the full text
    Extended models for TSALBP with ergonomic risk constraints  Open access

     Bautista Valhondo, Joaquin; Batalla Garcia, Cristina; Alfaro Pozo, Rocio; Cano Perez, Alberto
    IFAC Conference on Manufacturing Modelling, Management, and Control
    Presentation's date: 2013-06-20
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    In this paper, we present an extension to the TSALB problem (Time and Space constrained Assembly Line Balancing) with ergonomic risk restrictions. This ergonomic risk is defi ned from the task durations and their categories regarding to the risk factor for the workers. A study is presented through a case linked to an engine assembly line in the Automobile industry, considering variable demand.

    In this paper, we present an extension to the TSALB problem (Time and Space constrained Assembly Line Balancing) with ergonomic risk restrictions. This ergonomic risk is defi ned from the task durations and their categories regarding to the risk factor for the workers. A study is presented through a case linked to an engine assembly line in the Automobile industry, considering variable demand.

  • Access to the full text
    Algoritmos GRASP para solucionar el problema Blocking Flow Shop  Open access

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio; Batalla Garcia, Cristina
    Congreso Español de Metaheurísticas, Algoritmos Evolutivos y Bioinspirados
    Presentation's date: 2013-09-19
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    Se resuelve el Blocking Flow Shop Problem (BFSP), consis- te en determinar una secuencia de piezas procesadas por una lnea de maquinas sin espacios de almacenamiento entre ellas. Para ello, se im- plementan 14 algoritmos heursticos Greedy Randomized Adaptive Search Procedure (GRASP) aplicados a las 60 primeras instancias de Taillard. Los resultados obtenidos con los 7 procedimientos que incorporan la heurstica de Nawaz son los mas competitivos cuando se comparan con otros los de la literatura.

    Se resuelve el Blocking Flow Shop Problem (BFSP), consis- te en determinar una secuencia de piezas procesadas por una l nea de m aquinas sin espacios de almacenamiento entre ellas. Para ello, se im- plementan 14 algoritmos heur sticos Greedy Randomized Adaptive Search Procedure (GRASP) aplicados a las 60 primeras instancias de Taillard. Los resultados obtenidos con los 7 procedimientos que incorporan la heur stica de Nawaz son los m as competitivos cuando se comparan con otros los de la literatura.

  • Access to the full text
    Hybrid procedure based on Bounded Dynamic Programming and Linear Programming for solving a variant of the MMSP-W  Open access

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio; Batalla Garcia, Cristina
    IFAC Conference on Manufacturing Modelling, Management, and Control
    Presentation's date: 2013-06-20
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    n this paper, we propose a hybrid procedure based on Bounded Dynamic Programming ( BDP ) and linear programming to solve the Mixed - Model Se quencing Problem with Workload Minimization ( MMSP - W ), with serial workstations, free interruption of the operations and production mix restrictions. We performed a computational experiment with 225 instances from the literature. The results of our proposal are compared with those obtained through the Gurobi solver and previous procedures

  • Models for MMSP-W considering workstation dependencies: A case study of Nissan¿s Barcelona plant

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    European journal of operational research
    Date of publication: 2012-12-16
    Journal article

    View View Open in new window  Share Reference managers Reference managers Open in new window

  • Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan¿s Barcelona Plant

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    Expert systems with applications
    Date of publication: 2012-09-15
    Journal article

    Read the abstract Read the abstract View View Open in new window  Share Reference managers Reference managers Open in new window

    In this paper, we present an extension to the mixed-model sequencing problem with work overload minimisation (MMSP-W) for production lines with serial workstations and parallel homogeneous processors. The extension is intended to meet the industrial need to sequence various products so that the work required and completed at the workstations over time is as constant as possible. Several approaches are proposed to formulate the problem, giving rise to different models. Four models are selected, and their performances are compared after running the Gurobi solver, using instances from the literature and a case study of the Nissan powertrain plant in Barcelona.

  • Performance of Bounded Dynamic Programming applied to a variant of the MMSP-W problem

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Cano Perez, Alberto
    Date of publication: 2012-01-10
    Book chapter

    View View Open in new window  Share Reference managers Reference managers Open in new window

  • Solving the ORVP with preservation of the production mix using BDP

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Cano Perez, Alberto
    International Conference on Industrial Engineering and Industrial Management. Congreso de Ingeniería de Organización
    Presentation's date: 2012-07-19
    Presentation of work at congresses

     Share Reference managers Reference managers Open in new window

  • Modeling and solving a variant of MMSP-W problem with production mix restrictions

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    International Conference on Industrial Engineering and Industrial Management. Congreso de Ingeniería de Organización
    Presentation's date: 2012-07-19
    Presentation of work at congresses

     Share Reference managers Reference managers Open in new window

  • Access to the full text
    Incorporando regularidad del trabajo requerido al MMSP con mínima sobrecarga.  Open access

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2012-07-19
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    We present a mathematical model for a variant of Mixed - Model Se-quencing Problem (MMSP) with minimal work - overload and constant maintenan-ce of required work rate. We performed a computational experience with reference instances from the literature using Mixed Integer Linear Programming (MILP).

    Se presenta un modelo matemático para una variante del problema Mixed - Model Sequencing ( MMSP ) minimizando la sobrecarga y manteniendo constante la tasa del trabajo requerido. Se realiza un exper i mento con ejemplares de ref e rencia de la literatura empleando Programación Lineal Entera Mixta

  • Access to the full text
    Modeling and solving a variant of MMSP-W problem with production mix restrictions.  Open access

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2012-07-19
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    In this paper, we propose a procedure based on Bounded Dynamic Programming (BDP) to solve the Mixed-Model Sequencing Problem with Work over-load Minimisation (MMSP-W), with serial workstations, unrestricted (or free) interruption of the operations and with production mix restrictions.

    In this paper, we propose a procedure based on Bounded Dynamic Pr o- gramming ( BDP ) to solve the Mixed - Model Sequencing Problem with Work ove r- load Minimisation ( MMSP - W ), with serial workstations, unrestricted (or free) int e- rruption of the operations and with production mix restrictions.

  • Access to the full text
    Solving the ORVP with preservation of the production mix using BDP.  Open access

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Cano Perez, Alberto
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2012-07-19
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    We present a sequencing problem given on JIT (Just In Time) manufa c- turing env i ronments, with the objective of minimizing the variation of production rates ( ORV : Ou t put Rate Variation). We propose an extension of this problem based on t o r e quire, to the sequences, the preservation of the production mix throughout the manufa c turing of the products. To solve the ORVP (Output Rate Variation Problem) and the extended problem, we propose algorithms based on BDP ( Bounded Dynamic Progra m ming).

  • Access to the full text
    Incorporating ergonomics factors into the TSALBP  Open access

     Bautista Valhondo, Joaquin; Batalla Garcia, Cristina; Alfaro Pozo, Rocio
    International Conference on Advances in Production Management Systems
    Presentation's date: 2012-09-25
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    Assembly lines with mixed products presents ergonomics risk that can affect to the productivity of the workers and the lines. In this work we propose to incorporate ergonomics factors to the TSALBP (Time and Space constrained Assembly Line Balancing Problems). So, we present several elements for new models to assign the tasks to a workstation considering technological, management and ergonomics factors.

  • Access to the full text
    Incorporating regularity of required workload to the MMSP-W with serial workstations and free interruption of the operations  Open access

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Cano Perez, Alberto
    International Conference on Advances in Production Management Systems
    Presentation's date: 2012-09-25
    Presentation of work at congresses

    Read the abstract Read the abstract Access to the full text Access to the full text Open in new window  Share Reference managers Reference managers Open in new window

    We propose a mathematical model to solve an extension to the mixed-model sequencing problem with work overload minimization (MMSP-W) for production lines with serial workstations and parallel homogeneous processors and regularizing the required workload. We performed a computational experience with a case study of the Nissan engine plant in Barcelona. © IFIP International Federation for Information Processing 2013.

  • Modelos para el MMSP-W con estaciones en serie, procesadores paralelos, libre interrupción de operaciones y homogeneidad del trabajo requerido

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Cano Perez, Alberto
    Congreso Nacional de Estadística e Investigación Operativa
    Presentation's date: 2012-04-17
    Presentation of work at congresses

     Share Reference managers Reference managers Open in new window

  • Algoritmos GRASP para el MMSP-W con estaciones en serie y libre interrupción de operaciones

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    Congreso Español sobre Metaheurísticas, Algoritmos Evolutivos y Bioinspirados
    Presentation's date: 2012-02-10
    Presentation of work at congresses

     Share Reference managers Reference managers Open in new window

  • Incorporando regularidad del trabajo requerido al MMSP con mínima sobrecarga

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    International Conference on Industrial Engineering and Industrial Management. Congreso de Ingeniería de Organización
    Presentation's date: 2012-07-19
    Presentation of work at congresses

     Share Reference managers Reference managers Open in new window

  • A bounded dynamic programming algorithm for the MMSP-W considering workstation dependencies and unrestricted interruption of the operations

     Bautista Valhondo, Joaquin; Cano Perez, Alberto; Alfaro Pozo, Rocio
    International Conference on Intelligent Systems Design and Applications
    Presentation's date: 2011-11-22
    Presentation of work at congresses

    View View Open in new window  Share Reference managers Reference managers Open in new window

  • Performance of bounded dynamic programming applied to a variant of the MMSP-W problem

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Cano Perez, Alberto
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2011-09-07
    Presentation of work at congresses

     Share Reference managers Reference managers Open in new window

  • Simulación de la dinámica de un almacén distribuidor de equipos de medida de energía eléctrica destinada al consumo

     Alfaro Pozo, Rocio; Perpiñán, Lourdes; Bautista Valhondo, Joaquin; Rami, Ruben
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2011-09-06
    Presentation of work at congresses

     Share Reference managers Reference managers Open in new window

  • Programación restringida de operaciones en talleres híbridos integrados sobre unidades en secuencia

     Bautista Valhondo, Joaquin; Alfaro Pozo, Rocio; Batalla Garcia, Cristina; Garcia Pascual, Juan Carlos; Llovera Saez, Francisco Javier; Llovera Laborda, Sara
    Participation in a competitive project

     Share