Loading...
Loading...

Go to the content (press return)

Scientific and technological production

1 to 50 of 79 results
 
  • A note on the paper ‘Demonstrating Johnson’s algorithm via resource constrained scheduling’

     Companys , R.; Ribas, I.
    International journal of production research
    p. 1-2
    DOI: 10.1080/00207543.2017.1401242
    Date of publication: 2017-11-13
    Journal article
  • Analysis of mobility patterns and intended use of shared mobility services in the Barcelona region

     Gilibert, M.; Ribas, I.; Rodriguez-Donaire, S.
    European Transport Conference
    p. 1-20
    Presentation's date: 2017-10-06
    Presentation of work at congresses
  • Efficient heuristics for the parallel blocking flow shop scheduling problem

     Ribas, I.; Companys , R.; Tort-Martorell, J.
    Expert systems with applications
    Vol. 74, p. 41-54
    DOI: 10.1016/j.eswa.2017.01.006
    Date of publication: 2017-05-15
    Journal article
  • A critical sight to the NEH heuristic

     Companys , R.; Ribas, I.
    Date of publication: 2017-04-03
    Book chapter
  • An evaluation model for adaptation of organizational culture to lean culture

     Taherimashhadi, M.; Ribas, I.
    International Conference on Industrial Engineering and Industrial Management and Congreso de Ingeniería de Organización
    Presentation of work at congresses
  • Mobility ecosystem

     Ribas, I.
    Competitive project
  • Mobility ecosystem

     Rodriguez-Donaire, S.; Ribas, I.; Gilibert, M.
    Competitive project
  • Heuristics for the distributed blocking Ffow shop scheduling problem  Open access

     Ribas, I.; Companys , R.
    International Conference on Project Management and Scheduling
    p. 1-4
    Presentation's date: 2016-04-20
    Presentation of work at congresses
    Access to the full text
  • Access to the full text
  • Presentació de la divisió d’enginyeria d’organització i logística de l’institut d’organització i control de sistemes industrials de la UPC

     Lusa, A.; Benedito, E.; Calleja, G.; Corominas, A.; Ferrer-Martí, L.; García-Villoria, A.; Martinez, M.; Mateo, M.; Olivella, J.; Pastor, Rafael; Ribas, I.; Rua, C.
    Jornada de Recerca a l'ETSEIB
    Presentation's date: 2016-02
    Presentation of work at congresses
  • Conceptos, instrumentos, modelos y algoritmos para el diseño de la supply chain

     Lusa, A.; Olivella, J.; Mateo, M.; Martinez, M.; Benedito, E.; Ribas, I.; Rubio, S.; Calleja, G.; Corominas, A.
    Competitive project
  • Efficient constructive procedures for the distributed blocking flowshop scheduling problem  Open access

     Companys , R.; Ribas, I.
    International Conference on Industrial Engineering and Systems Management
    p. 92-98
    Presentation's date: 2015-10-22
    Presentation of work at congresses
  • An efficient discrete artificial bee colony algorithm for the blocking flow shop problem with total flowtime minimization  Open access

     Ribas, I.; Companys , R.; Tort-Martorell, J.
    Expert systems with applications
    Vol. 42, num. 15-16, p. 6155-6167
    DOI: 10.1016/j.eswa.2015.03.026
    Date of publication: 2015-09-01
    Journal article
    Access to the full text
  • Methodological elements of supply chain design  Open access

     Corominas, A.; Mateo, M.; Ribas, I.; Rubio, S.
    International journal of production research
    Vol. 53, num. 16, p. 5017-5030
    DOI: 10.1080/00207543.2015.1013641
    Date of publication: 2015-08-18
    Journal article
    Access to the full text
  • Efficient heuristic algorithms for the blocking flow shop scheduling problem with total flow time minimization

     Ribas, I.; Companys , R.
    Computers and industrial engineering
    Vol. 87, p. 30-39
    DOI: 10.1016/j.cie.2015.04.013
    Date of publication: 2015-05-01
    Journal article
  • Some trends and applications of operational research/management science to operations management  Open access

     Companys , R.; Ribas, I.
    International journal of production management and engineering
    Vol. 3, num. 1, p. 1-12
    DOI: 10.4995/ijpme.2015.3459
    Date of publication: 2015-01-15
    Journal article
    Access to the full text
  • A New Constructive Heuristic for the Fm|block|ST  Open access

     Companys , R.; Ribas, I.
    Date of publication: 2014-08-31
    Book chapter
    Access to the full text
  • A competitive variable neighbourhood search algorithm for the blocking flow shop problem

     Ribas, I.; Companys, R.; Tort-Martorell, J.
    European journal of industrial engineering
    Vol. 7, num. 6, p. 729-754
    DOI: 10.1504/EJIE.2013.058392
    Date of publication: 2013-12-23
    Journal article
  • Access to the full text
  • A new constructive heuristic for the Fm|block|¿T  Open access

     Companys, R.; Ribas, I.
    International Conference on Industrial Engineering and Industrial Management
    p. 500-507
    Presentation's date: 2013-07-11
    Presentation of work at congresses
    Access to the full text
  • Decisiones en el diseño de redes de logística inversa: propuesta de un modelo de decisión  Open access

     Ribas, I.; Rubio, S.
    International Conference on Industrial Engineering and Industrial Management
    p. 1025-1033
    Presentation's date: 2013-07-11
    Presentation of work at congresses
    Access to the full text
  • An efficient iterated local search algorithm for the total tardiness blocking flow shop problem

     Ribas, I.; Companys, R.; Tort-Martorell, J.
    International journal of production research
    Vol. 51, num. 17, p. 5238-5252
    DOI: 10.1080/00207543.2013.802390
    Date of publication: 2013-04-27
    Journal article
  • REALISTIC EXTENDED SCHEDULING USING LIGHT TECHNIQUES

     Ruiz, R.; Ribas, I.; ALLAHVERDI , A.; CIAVOTTA, M.; Companys , R.; FANJUL, L.; Fernández, C.; KATRAGJINI , K.; PAN, Q.; Vallada, E.; URLINGS, T.
    Competitive project
  • Planificación estratégica de la capacidad en una empresa del sector alimentación (Strategic multi-site capacity planning for a food industry)

     Companys, R.; Ribas, I.; Bautista, J.
    Dirección y Organización. Revista de Ingeniería de Organización
    Vol. 48, p. 11-16
    Date of publication: 2012-12
    Journal article
  • Planificación estratégica de la capacidad en una empresa del sector alimentación  Open access

     Companys, R.; Ribas, I.; Bautista, J.
    Dirección y organización
    num. 48, p. 11-16
    Date of publication: 2012-10-11
    Journal article
    Access to the full text
  • Solving the Fm|block|Cmax problem using bounded dynamic programming  Open access

     Bautista, J.; Cano, A.; Companys, R.; Ribas, I.
    Engineering applications of artificial intelligence
    Vol. 25, num. 6, p. 1235-1245
    DOI: 10.1016/j.engappai.2011.09.001
    Date of publication: 2012-09-25
    Journal article
    Access to the full text
  • Hybrid metaheuristics for the tardines blocking flow shop problem  Open access

     Ribas, I.; Companys, R.; Tort-Martorell, J.
    Date: 2012-09-04
    Report
    Access to the full text
  • Best solutions of Ronconi, Imma-B and ImmA-C instances for the Fm|block|  Open access

     Companys, R.; Ribas, I.
    Date: 2012-09-04
    Report
    Access to the full text
  • An efficient hybrid iterated local search algorithm for the total tardiness blocking flow shop problem  Open access

     Ribas, I.; Companys, R.; Tort-Martorell, J.
    Date: 2012-09-04
    Report
    Access to the full text
  • Planificación estratégica de la capacidad en una empresa del sector alimentación

     Companys, R.; Ribas, I.; Bautista, J.
    International Conference on Industrial Engineering and Industrial Management. Congreso de Ingeniería de Organización
    p. 109
    Presentation's date: 2012-07-18
    Presentation of work at congresses
  • El curioso comportamiento del procedimiento de inserción de la heurística NEH en el problema Fm|block|Cmax  Open access

     Companys, R.; Ribas, I.
    International Conference on Industrial Engineering and Industrial Management
    p. 1-8
    Presentation's date: 2012-07-18
    Presentation of work at congresses
    Access to the full text
  • Solving flow shop problems with bounded dynamic programming

     Bautista, J.; Cano, A.; Companys, R.; Ribas, I.
    Date of publication: 2012-01-10
    Book chapter
    Image
  • New insights on the blocking flow shop problem best solutions updated. Vol.6  Open access

     Companys, R.; Ribas, I.
    Date: 2011-11-11
    Report
    Access to the full text
  • Solving flow shop problems with bounded dynamic programming

     Bautista, J.; Cano, A.; Ribas, I.; Companys, R.
    International Conference on Industrial Engineering and Industrial Management
    Presentation's date: 2011-09-07
    Presentation of work at congresses
  • A bounded dynamic programming algorithm for the blocking flow shop problem.

     Bautista, J.; Cano, A.; Ribas, I.; Companys, R.
    IEEE Workshop on Computational Intelligence in Productions and Logistics Systems
    p. 8-15
    Presentation's date: 2011-04-14
    Presentation of work at congresses
  • A Bounded Dynamic Programming algorithm for the Blocking Flow Shop problem

     Bautista, J.; Cano, A.; Companys, R.; Ribas, I.
    IEEE Symposium on Computational Intelligence in Multi-Criteria Decision-Making
    Presentation's date: 2011-04-12
    Presentation of work at congresses
  • A bounded dynamic programming algorithm for the blocking flow shop problem

     Bautista, J.; Cano, A.; Companys , R.; Ribas, I.
    Date of publication: 2011-04-11
    Book chapter
  • Planificación de la capacidad a largo plazo y diseño de la red de suministro

     Lusa, A.; Coves, A.; Mateo, M.; Benedito, E.; Mas, M.; Martinez, M.; Corominas, A.; Ribas, I.; Domenech, B.; De La Torre, R.; Olivella, J.
    Competitive project
  • An iterated greedy algorithm for the flowshop scheduling problem with blocking

     Ribas, I.; Companys, R.; Tort-Martorell, J.
    Omega: the international journal of management science
    Vol. 39, num. 3, p. 293-301
    DOI: 10.1016/j.omega.2010.07.007
    Date of publication: 2011
    Journal article
  • Newinsights on the blocking flow shop problem best solutions updated  Open access

     Companys, R.; Ribas, I.
    Date: 2010-12-13
    Report
    Access to the full text
  • Improvement tools for NEH based heuristics on permutation and blocking flow shop scheduling problems

     Ribas, I.; Mateo, M.; Companys, R.
    DOI: 10.1007/978-3-642-16358-6
    Date of publication: 2010-12-01
    Book chapter
  • Propuesta de procedimientos para mejorar los resultados obtenidos por la heurística NEH en el problema flow shop con bloqueos  Open access

     Ribas, I.; Mateo, M.; Companys, R.
    International Conference on Industrial Engineering and Industrial Management. Congreso de Ingeniería de Organización
    p. 100
    Presentation's date: 2010-09-08
    Presentation of work at congresses
  • Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective

     Ribas, I.; Leisten, R.; Framiñan, J.
    Computers & operations research
    Vol. 37, num. 8, p. 1439-1454
    DOI: 10.1016/j.cor.2009.11.001
    Date of publication: 2010-08
    Journal article
  • Scheduling of jobs in a parallel machine problem with eligibility and release and queue times

     Mateo, M.; Garriga, X.; Ribas, I.
    European Conference on Operational Research
    p. 253
    Presentation's date: 2010-07-14
    Presentation of work at congresses
  • Comparing three-step heuristics for the permutation flow shop problem

     Ribas, I.; Companys, R.; Tort-Martorell, J.
    Computers & operations research
    DOI: 10.1016/j.cor.2010.02.006
    Date of publication: 2010-03-03
    Journal article
  • New insights on the blocking flow shop problem  Open access

     Companys, R.; Ribas, I.
    Date: 2010-02-01
    Report
    Access to the full text