Loading...
Loading...

Go to the content (press return)

Incorporating regularity of required workload to the MMSP-W with serial workstations and free interruption of the operations

Author
Bautista, J.; Alfaro, R.; Cano, A.
Type of activity
Presentation of work at congresses
Name of edition
International Conference on Advances in Production Management Systems
Date of publication
2012
Presentation's date
2012-09-25
Book of congress proceedings
International Conference on Advances in Production Management Systems proceedings
First page
405
Last page
412
DOI
https://doi.org/10.1007/978-3-642-40352-1_51 Open in new window
Repository
http://hdl.handle.net/2117/16783 Open in new window
URL
http://www.prothius.com/pubs/IR-MMSPW-APMS2012.pdf Open in new window
Abstract
We propose a mathematical model to solve an extension to the mixed-model sequencing problem with work overload minimization (MMSP-W) for production lines with serial workstations and parallel homogeneous processors and regularizing the required workload. We performed a computational experience with a case study of the Nissan engine plant in Barcelona. © IFIP International Federation for Information Processing 2013.
Citation
Bautista, J.; Alfaro, R.; Cano, A. Incorporating regularity of required workload to the MMSP-W with serial workstations and free interrumption of the operations. A: International Conference on Advances in Production Management Systems. "International Conference on Advances in Production Management Systems proceedings". Rodas: 2012.
Keywords
Linear programming, Manufacturing, Sequencing, Work overload
Group of research
OPE-PROTHIUS -

Participants

Attachments