Rework in highway projects

Author
Forcada, N.; Russinyol, G.; Macarulla, M.; Love, P.E.D
Type of activity
Journal article
Journal
Journal of civil engineering and management (Spausdinta)
Date of publication
2014-07-04
Volume
20
Number
4
First page
445
Last page
465
DOI
https://doi.org/10.3846/13923730.2014.893917 Open in new window
Repository
http://hdl.handle.net/2117/88666 Open in new window
URL
http://www.tandfonline.com/doi/abs/10.3846/13923730.2014.893917#.U8OfDJR_swA Open in new window
Abstract
There is limited systematic knowledge available about the dynamics of rework in highway projects, despite the fact that they frequently exceed budget and schedule by more than 10%. A case study of a Spanish highway project, which experienced a significant cost overrun as a result of rework, is examined and the causal factors that contributed to its occurrence are determined. Through observation and subsequent analysis of interviews and documentation a high degree of interdependency existed betwe...
Citation
Forcada, N., Russinyol, G., Macarulla, M., Love, P.E.D. Rework in highway projects. "Journal of civil engineering and management (Spausdinta)", 04 Juliol 2014, vol. 20, núm. 4, p. 445-465.
Keywords
Highway projects, Rework, System dynamics