Carregant...
Carregant...

Vés al contingut (premeu Retorn)

The latent causes of rework in floating production storage and offloading projects

Autor
Love, P.E.D.; Edwards, D. J.; Irani, Z.; Forcada, N.
Tipus d'activitat
Article en revista
Revista
Journal of civil engineering and management (Spausdinta)
Data de publicació
2014-06-01
Volum
20
Número
3
Pàgina inicial
315
Pàgina final
329
DOI
https://doi.org/10.3846/13923730.2013.802725 Obrir en finestra nova
Repositori
http://hdl.handle.net/2117/23291 Obrir en finestra nova
URL
http://www.tandfonline.com/doi/abs/10.3846/13923730.2013.802725#.U6GRfSjeUSs Obrir en finestra nova
Resum
There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects are prone to significant cost and schedule growth. On average, FPSOs have been reported to experience a 20% cost growth and are delayed by six months. Overruns and delays represent uncertainties for ow...
Citació
Love, P.E.D. [et al.]. The latent causes of rework in floating production storage and offloading projects. "Journal of civil engineering and management (Spausdinta)", 2014, vol. 20, núm. 3, p. 315-329.
Paraules clau
FPSO, conversion, errors, learning, new build, retrospection, rework, sensemaldng
Grup de recerca
GRIC - Grup de Recerca i Innovació de la Construcció

Participants

  • Love, Peter E.D.  (autor)
  • Edwards, David J.  (autor)
  • Irani, Zahir  (autor)
  • Forcada Matheu, Nuria  (autor)