Loading...
Loading...

Go to the content (press return)

Incorporating regularity of required workload to the MMSP-W with serial workstations and free interruption of the operations

Author
Bautista, J.; Alfaro, R.; Cano, A.
Type of activity
Book chapter
Book
Advances in production management systems. Competitive manufacturing for innovative products and services. IFIP advances in information and communication technology
First page
405
Last page
412
Publisher
Springer
Date of publication
2013-09-02
ISBN
978-3-642-40351-4 Open in new window
DOI
https://doi.org/10.1007/978-3-642-40352-1 Open in new window
URL
http://link.springer.com/book/10.1007/978-3-642-40352-1/page/1 Open in new window
Abstract
We propose a mathematical model to solve an extension to the mixed-model sequencing problem with work overload minimization (MMSP-W) for production lines with serial workstations and parallel homogeneous processors and regularizing the required workload. We performed a computational experience with a case study of the Nissan engine plant in Barcelona.
Keywords
Linear programming, Manufacturing, Sequencing, Work overload
Group of research
OPE-PROTHIUS -

Participants