Loading...
Loading...

Go to the content (press return)

Productivity improvement, considering legal conditions and Just In Time principles in the mixed-model Sequencing problem

Author
Bautista, J.; Alfaro, R.; Batalla, C.
Type of activity
Presentation of work at congresses
Name of edition
International Conference on Industrial Engineering and Industrial Management. International Conference on Industrial Engineering and Operations Management. International IIE Conference
Date of publication
2015
Presentation's date
2015-07-07
Book of congress proceedings
Engineering Systems and Networks: the way ahead for industrial engineering and operations management
First page
60
Last page
68
DOI
10.13140/RG.2.1.3591.0243
Project funding
DPI2010-16759. PROTHIUS-III: Programación Restringida de Operaciones en Talleres Híbridos Integrados sobre Unidades en Secuencia. Industria del automóvil (aspectos económicos, jurídicos y sociales)
Factor Humano e Incertidumbre sobre la Secuenciación y el Equilibrado en Líneas de Modelos Mixtos
Repository
http://hdl.handle.net/2117/28550 Open in new window
URL
http://www.icieom.org/ Open in new window
Abstract
A new mathematical model to solve the Mixed-Model Sequencing Problem with Work overload minimization is formulated. The model incorporates productive, social and legal aspects in order to move the theory problem closer to the actual industrial environments. Specifically, there are considered the variation of work pace of workers throughout the workday to increase the completed work; the conditions of occupancy level of workers imposed by the collective agreements; and the idea of keeping constan...
Citation
Bautista, J.; Alfaro, R.; Batalla, C. Productivity improvement, considering legal conditions and Just In Time principles in the mixed-model Sequencing problem. A: International Conference on Industrial Engineering and Industrial Management. International Conference on Industrial Engineering and Operations Management. International IIE Conference. "Engineering Systems and Networks: the way ahead for industrial engineering and operations management". Aveiro: 2015, p. 1-8.
Keywords
Mixed-model, just-in-time, saturation, sequencing, work pace
Group of research
OPE-PROTHIUS -

Participants