Control of virtual synchronous phtovoltaic power plants with energy storage

Total activity: 24
Type of activity
Competitive project
Acronym
SynchPV
Funding entity
MIN DE ECONOMIA Y COMPETITIVIDAD
Funding entity code
ENE2014-60228-R
Amount
205.700,00 €
Start date
2015-01-01
End date
2017-12-31
Abstract
The development of virtually synchronous PV power plants will permit to solve the problems that currently a high penetration of
conventional PV power plants will generate in the electrical network, mainly from the point of view of the network stability, by means of
providing new functionalities and services. This is a priority objective for achieving the goals outlined in the H2020, especially those related to reach the 20% of installed capacity from renewables, as PV is the technology with the highest potential
after wind power
The virtually synchronous PV power plants studied in the framework of this project will have the capability of fulfilling all the requirements
that arise in the current grid codes, or even in the existing drafts which are under development. Moreover, they will be able to offer all the
features of a synchronous generation based power plant in terms of network support services, providing even an improved response that
conventional synchronous generators cannot supply, thanks to the advanced power processing capabilities that the Synchronous Power
Controller (SPC), are able to provide. In a nutshell, the project has the following objectives.
- To scale up the synchronous controller to the plant level, enabling a PV plant to offer a virtually synchronous performance.
- To analyze and develop a distributed control system for the virtually synchronous power plant able to handle all the processes in the
power conversion chain, taking case of the automatic operation of the plant, the grid interaction and even its relationship with the energy
markets.
- To extend the concept of transactive power and develop new optimization algorithms based on sharing, in a competitive way, all the
functionalites among all the elements that integrate the plant, boosting thus the overall efficiency of the system,
- To analyze and build a secondary control layer for the plant that takes into account the synchronous performance and shares the duties
accordingly among the different units following also a competitive criteria.
- To analyze and design control algorithms at the cluster level in order to make and optimal sharing of the control duties associated to the
secondary control response.
- To develop intelligent algorithms for processing the information gathered from the power plant and use it for performing predictive
operation and maintenance.
- To analize the sizing criteria and control requirement associated to the integration and management of the energy storage system that
should be part of the virtually synchronous PV power plant.
- To analyze the impact of the virtually synchronous PV power plants in the electrical network, and compare it with the effect of
conventional ones.
- To analyze the additional functionalities that this kind of plants would provide, mainly those related to frequency control and auxiliary
services.
Scope
Adm. Estat
Plan
Plan Estatal de Investigación Científica y Técnica y de Innovación 2013-2016
Call year
2015
Funcding program
Programa Estatal de I+D+i Orientada a los Retos de la Sociedad
Funding call
Retos de Investigación: Proyectos de I+D+i
Grant institution
Gobierno De España. Ministerio De Economía Y Competitividad, Mineco

Participants

Scientific and technological production

1 to 24 of 24 results