Loading...
Loading...

Go to the content (press return)

Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement

Author
Bautista, J.; Alfaro, R.; Batalla, C.
Type of activity
Journal article
Journal
Expert systems with applications
Date of publication
2015
Volume
42
Number
22
First page
8896
Last page
8910
DOI
https://doi.org/10.1016/j.eswa.2015.07.044 Open in new window
Project funding
DPI2010-16759. PROTHIUS-III: Programación Restringida de Operaciones en Talleres Híbridos Integrados sobre Unidades en Secuencia. Industria del automóvil (aspectos económicos, jurídicos y sociales)
FACTOR HUMANO E INCERTIDUMBRE SOBRE LA SECUENCIACION Y EL EQUILIBRADO EN LINEAS DE MODELOS MIXTOS
Repository
http://hdl.handle.net/2117/88166 Open in new window
URL
http://www.sciencedirect.com/science/article/pii/S0957417415005047 Open in new window
Abstract
Beginning with a variation of the sequencing problem in a mixed-products line (MMSP-W: Mixed-Model Sequencing Problem with Workload Minimization), we propose two new models that incorporate a set of working conditions in regard with human resources of workstations on the line. These conditions come from collective agreements and therefore must be respected by both company and labor unions. The first model takes into account the saturation limit of the workstations, and the second model also incl...
Citation
Bautista, J., Alfaro, R., Batalla, C. Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement. "Expert systems with applications", 2015, vol. 42, núm. 22, p. 8896-8910.
Keywords
Activity factor, Manufacturing operations, Mixed-product line, Saturation, Sequencing, Work overload
Group of research
OPE-PROTHIUS -

Participants

Attachments