Simulation of steam generator plugging tubes in a PWR to analyze the operating impact

Author
Pla, P.; Reventos, F.; Martín, M.; Sol, I.; Strucic , M.
Type of activity
Journal article
Journal
Nuclear engineering and design
Date of publication
2016-08-15
Volume
305
First page
132
Last page
145
DOI
https://doi.org/10.1016/j.nucengdes.2016.05.002 Open in new window
URL
http://www.sciencedirect.com/science/article/pii/S0029549316300978 Open in new window
Abstract
A number of nuclear power plants (NPPs) with pressurized water reactors (PWR) in the world have replaced their steam generators (SG) due to degradation of the SG tubes caused by different problems. Several methods were attempted to correct the defects of the tubes, but eventually the only permanent solution was to plug them. The consequences of plugging the tubes are the decrease of heat transfer surface, the reduction of the flow area and subsequent reduction of the primary system mass flow and...
Keywords
JEL classification, Risk analysis
Group of research
ANT - Advanced Nuclear Technologies Research Group