Loading...
Loading...

Go to the content (press return)

Minimizing lost-work costs in a mixed-model assembly line

Author
Bautista, J.; Alfaro, R.; Batalla, C.
Type of activity
Presentation of work at congresses
Name of edition
XX Congreso de Ingeniería de Organización. XXII International Conference on Industrial Engineering and Operations Management. International IISE Conference 2016. International AIM Conference 2016
Date of publication
2016
Presentation's date
2016-07-13
Book of congress proceedings
Building bridges between researchers and practitioners: book of abstracts of the International Joint Conference CIO-ICIEOM-IIE-AIM, IJC 2016, "XX Congreso de Ingeniería de Organización", "XXII International Conference on Industrial Engineering and Operations Management", "International IISE Conference 2016", "International AIM Conference 2016": held on July, 13th to 15th of 2016 in San Sebastián
First page
3
Last page
3
Publisher
Universidad de Navarra
DOI
10.13140/RG.2.1.1009.5606/1
Project funding
Human factor and uncertainty on the sequencing and balancing mixed model lines
Repository
http://hdl.handle.net/2117/89114 Open in new window
https://www.researchgate.net/publication/305377794 Open in new window
Abstract
Mixed-model assembly lines present two issues due to differences in processing times from product types; these issues are the work overload or unfinished work and the useless time or unproductive time. Within this context, we present, in this paper, a new mathematical model for the mixed-model sequencing problem. This model minimizes the costs by lost production and idle productive time. The model also allows processors carry out their workload with a factor activity greater than the normal, in ...
Citation
Bautista, J., Alfaro, R., Batalla, C. Minimizing lost-work costs in a mixed-model assembly line. A: International Conference on Industrial Engineering and Industrial Management. International Conference on Industrial Engineering and Operations Management. International IIE Conference. "CIO-ICIEOM-IISE-AIM International Joint Conference (IJC2016)". San Sebastián: Universidad de Navarra, 2016, p. 3.
Keywords
Assembly line, Costs, Sequencing, Useless time, Work overload
Group of research
OPE-PROTHIUS -

Participants

Attachments