Loading...
Loading...

Go to the content (press return)

Adding diversity to a Multiobjective Ant Colony algorithm for time and Space Assembly Line Balancing

Author
Chica, M.; Cordón, O.; Damas, S.; Bautista, J.
Type of activity
Book chapter
Book
IEEE International Symposium on Assembly and Manufacturing, 2009. ISAM 2009
First page
364
Last page
369
Publisher
IEEE Computer Society Conference Publishing Services (CPS)
Date of publication
2009-11-17
ISBN
978-1-4244-4627-8 Open in new window
Repository
http://hdl.handle.net/2117/89575 Open in new window
URL
http://ieeexplore.ieee.org/xpl/mostRecentIssue.jsp?punumber=5367681 Open in new window
Abstract
Proceedings of T2B.3 2009 IEEE International Symposium on Assembly and Manufacturing 17-20 November 2009, Suwon, Korea 978-1-4244-4628-5/09/$25.00 ©2009 IEEE Mixed-model sequencing problem with overload minimization considering workstations dependencies Joaqu ́ ın Bautista and Ra ́ ul Su ́ arez Abstract — This paper reviews the formulation of the Mixed Model Sequencing Problem with Workload minimization (MMSP-W). Two significative models already presented in the literature are describe, s...
Citation
Bautista, J., Suarez, R. Mixed-Model Sequencing Problem with overload minimization considering workstations dependencies. A: "IEEE International Symposium on Assembly and Manufacturing, 2009. ISAM 2009". Los Alamitos (California): IEEE Computer Society Conference Publishing Services (CPS), 2009, p. 351-357.
Keywords
Aerospace industry, Algorithm design and analysis, Ant colony optimization, Assembly, Automotive engineering, Flow production systems, Job shop scheduling, Manufacturing, Scheduling algorithm, Workstations
Group of research
OPE-PROTHIUS -

Participants

  • Chica Serrano, Manuel  (author)
  • Cordón García, Oscar  (author)
  • Damas Arroyo, Sergio  (author)
  • Bautista Valhondo, Joaquin  (author)