Loading...
Loading...

Go to the content (press return)

Time-based conditions for synchronized procurement in Douki Seisan

Author
Bautista, J.; Fortuny-Santos, J.
Type of activity
Book chapter
Book
Closing the gap between practice and research in industrial engineering. Lecture Notes in Management and Industrial Engineering
First page
231
Last page
238
Publisher
Springer
Date of publication
2017-08-18
ISBN
978-3-319-58409-6 Open in new window
DOI
https://doi.org/10.1007/978-3-319-58409-6 Open in new window
Repository
https://rd.springer.com/book/10.1007%2F978-3-319-58409-6 Open in new window
URL
https://www.springer.com/978-3-319-58408-9?wt_mc=ThirdParty.RD.3.EPR653.About_eBook Open in new window
Abstract
This book presents the proceedings of the XXII International Conference on Industrial Engineering and Operations Management, International IIE Conference 2016, and International AIM Conference 2016. This joint conference is a result of an agreement between ADINGOR (Asociación para el Desarrollo de la Ingeniería de Organización), ABEPRO (Associação Brasileira de Engenharia de Produção), AIM (European Academy for Industrial Management) and the IIE (Institute of Industrial Engineers), and to...
Keywords
Just-in-sequence, Lean manufacturing, Mixed-model assembly line
Group of research
OPE-PROTHIUS -

Participants