Loading...
Loading...

Go to the content (press return)

Minimizing lost-work costs in a mixed-model assembly line

Author
Bautista, J.; Alfaro, R.; Batalla, C.
Type of activity
Book chapter
Book
Closing the gap between practice and research in industrial engineering
First page
213
Last page
221
Publisher
Springer
Date of publication
2018-01-01
ISBN
978-3-319-58408-9 Open in new window
DOI
https://doi.org/10.1007/978-3-319-58409-6 Open in new window
Repository
https://link.springer.com/book/10.1007/978-3-319-58409-6 Open in new window
URL
https://link.springer.com/ Open in new window
Keywords
Assembly line, costs, sequencing, useless time, work overload
Group of research
OPE-PROTHIUS -

Participants