Loading...
Loading...

Go to the content (press return)

Time-based conditions for synchronized procurement in Douki Seisan

Author
Bautista, J.; Fortuny-Santos, J.
Type of activity
Book chapter
Book
Closing the gap between practice and research in industrial engineering
First page
231
Last page
238
Publisher
Springer
Date of publication
2018-01-01
ISBN
978-3-319-58408-9 Open in new window
DOI
https://doi.org/10.1007/978-3-319-58409-6 Open in new window
Repository
https://link.springer.com/book/10.1007/978-3-319-58409-6 Open in new window
URL
https://link.springer.com/ Open in new window
Keywords
Just-in-sequence, Lean manufacturing, Mixed-model assembly line
Group of research
OPE-PROTHIUS -

Participants