A simulation and reliability based approach for setting starting times in multi-task projects with random rations and a common deadline

Author
Juan, Á.; Calvet , L.; Serrat, C.; Hatami, S.
Type of activity
Presentation of work at congresses
Name of edition
CYTED-SmartLogistics Madrid Workshop 2017
Date of publication
2017
Presentation's date
2017-11
Book of congress proceedings
CYTED-SmartLogistics Madrid 2017 Workshop : presentations
First page
1
Last page
17
Repository
https://www.dropbox.com/sh/p5j5ndcrfgcyeuh/AACGVout1ztVPx8wtAspv4GNa/08.%20carles.pdf?dl=0 Open in new window
Abstract
Production and transportation logistics are becoming increasingly complex due to the existence of joint projects. A project can be frequently decomposed as a set of independent and parallel tasks (e.g. ,production lines), some of which need to be finished in order to consider the project as completed on a given deadline.
Group of research
GRBIO - Biostatistics and Bioinformatics Research Group

Participants

  • Juan Pérez, Ángel Alejandro  (author and speaker )
  • Calvet Liñán, Laura  (author and speaker )
  • Serrat Pie, Carles  (author and speaker )
  • Hatami, Sara  (author and speaker )