Loading...
Loading...

Go to the content (press return)

Secuencias Quota en taller de flujo de demanda general con programación lineal entera mixta

Author
Bautista, J.; Alfaro, R.
Type of activity
Presentation of work at congresses
Name of edition
13th International Conference on Industrial Engineering and Industrial Management XXIII Congreso de Ingeniería de Organización
Date of publication
2019
Presentation's date
2019-07-12
Book of congress proceedings
13th International Conference on Industrial Engineering and Industrial Management and XXIII Congreso de Ingeniería de Organización: CIO 2019, Gijón, Spain, July 11-12, 2019
First page
25
Last page
26
Project funding
Human factor and uncertainty on the sequencing and balancing mixed model lines
Production optimization in hybrid workshops linked by units in sequence
URL
http://digibuo.uniovi.es/dspace/bitstream/10651/51471/1/Secuencias%20Quota.pdf Open in new window
Abstract
Presentamos modelos basados en la Programación Lineal Entera Mixta (PLEM) para obtener secuencias de productos mixtos en el problema Flow Shop Scheduling con demanda general y satisfaciendo la propiedad Quota. Realizamos la explotación de los modelos con solver CPLEX limitando el tiempo de CPU y utilizando instancias de la literatura de mediana y gran dimensión de la empresa NISSAN de Barcelona. Ante los resultados, concluimos que PLEM se puede añadir al conjunto de procedimientos útiles pa...
Keywords
Flow Shop Scheduling Problem, Level Schedules, Mixed Integer Linear Programming, Mixed Model Sequencing Problem, Overall Demand Plan
Group of research
OPE-PROTHIUS - Production and Business Management

Participants