Carregant...
Carregant...

Vés al contingut (premeu Retorn)

The Alamillo cable-stayed bridge: special issues faced in the analysis and construction

Autor
Aparicio, A.; Casas, J.
Tipus d'activitat
Article en revista
Revista
Proceedings of the Institution of Civil Engineers. Structures and buildings
Data de publicació
1997-11
Volum
122
Número
4
Pàgina inicial
432
Pàgina final
450
DOI
https://doi.org/10.1680/istbu.1997.29832 Obrir en finestra nova
Resum
The Alamillo bridge is one of the long-span bridges crossing the Guadalquivir river built on the occasion of Expo '92 held in 1992 in Sevilla (Spain). The bridge is a cable-stayed structure spanning 200 m without any intermediate supports, and its originality is in the lack of back stays and the balancing of the front stays through the backward inclination of a massive pylon.
Paraules clau
Alamillo, Guadalquivir, San Jeronimo, Sevilla, analysis, backfill, backward, behaviour, box, bridges, cable stayed, cables, catalunya technical, composite, concrete, construction, control, decks, design, dynamic, europe, external, fill, filling, forces, formwork, foundations, girders, inclination, instrumentation, instruments, loads, long, long span, monitoring, movement, piers, piles, pylons, reinforced, rivers, seville, spans, stays, steel, stiffening, structural, structures, tests, torsion, towers, transition, transverse, zones
Grup de recerca
EC - Enginyeria de la Construcció